The first park contains a capability of 200 MW even though Sandrini II includes a capacity of one hundred MW. The entire expense of both equally tasks were not disclosed nonetheless, throughout development, over two hundred workers were employed. The projects are predicted to determine a handful of positions opening https://justpaste.it/eo60k